Calculate total building costs, itemized Bill of Materials (Cement, Steel, Bricks, Sand, Labor), and milestone-wise cash flow timelines for your plot or duplex home.

Project Specifications

Customize built-up area, number of floors, and construction quality grade.

1,200 sq.ft / floor
Sq.Ft

Basic / Budget

Essential quality construction for rental properties or budget homes

1550/ sq.ft
Standard Flyash / Red Clay Bricks
Fe-500 TMT Steel & PPC Cement
Standard Vitrified Tiles (2ft x 2ft)
Standard CP & Sanitaryware Fittings
ISI Fire-Resistant Copper Wiring
Standard Distemper & Acrylic Primer

Standard / Premium

Selected

High durability and aesthetics for comfortable family residences

1950/ sq.ft
First-Class Red Clay Bricks / Solid Blocks
Primary Brand Fe-550D TMT (Tata / JSW)
Glazed Vitrified Tiles (4ft x 2ft GVT)
Jaquar / Hindware Premium CP & Sanitaryware
Teak Wood Main Door Frame with Flush Doors
Asian Paints Tractor Emulsion & UPVC Windows

Luxury / Ultra-Premium

Superior architectural finish, Italian marble & smart provisions

2750/ sq.ft
Solid AAC Blocks / High-Density Wirecut Bricks
High-Grade Fe-550D TMT + Waterproof Concrete
Italian Marble / Large Slab Porcelain & Wooden Flooring
Kohler / Grohe Concealed Diverters & Wall-Hung WC
Full Teak Main & Internal Doors with German Hardware
Asian Paints Royale Luxury Emulsion + Smart Automation Provision

Total Estimated Construction Cost

₹46,80,000

Total Built-Up: 2,400 sq.ftAvg Rate: 1950/sq.ft

Material & Labor BOM

2400 sq.ft

Cement

~960 Bags (PPC / OPC)

₹3,74,400

Steel (TMT Rebars)

~9.12 Metric Tons (9,120 kg)

₹6,56,640

Sand (M-Sand & Plaster)

~4,320 Cu.Ft

₹2,24,640

Aggregates (Coarse Stone)

~3,240 Cu.Ft (20mm/40mm)

₹1,36,080

Bricks / Blocks

~45,600 Units

₹4,33,200

Flooring & Tiles

~3,000 Sq.Ft Tiles Area

₹5,28,000

Woodwork, Doors & Windows

Frames, shutters, UPVC glazing

₹5,14,800

Plumbing & Electrical

Pipes, CP fittings, wires & switches

₹7,02,000

Painting & Finishing

Putty, primer, emulsion coats

₹2,80,800

Civil Labor & Contractor (~30%)

Masons, bar benders, carpenters & supervision

₹14,04,000

Stage-Wise Cash Flow Timeline

1. Excavation, Foundation & Plinth Beam₹7,02,000
Milestone: 15% of budgetEst. Duration: 3-4 Weeks
2. RCC Structure, Columns & Roof Slabs₹11,70,000
Milestone: 25% of budgetEst. Duration: 6-8 Weeks
3. Brickwork & Internal / External Plastering₹9,36,000
Milestone: 20% of budgetEst. Duration: 4-5 Weeks
4. Flooring, Electrical & Plumbing Rough-in₹11,70,000
Milestone: 25% of budgetEst. Duration: 5-6 Weeks
5. Painting, Woodwork, Fixtures & Handover₹7,02,000
Milestone: 15% of budgetEst. Duration: 3-4 Weeks

Hire Verified Civil Engineers & Builders

Get structural drawings, site supervision, and turnkey construction quotes from top verified professionals on Facing360.

Explore All

Quick Discovery Hub