Construction Cost & Material Estimator

Estimate total construction budget, turnkey labor cost, material quantities (Cement, Steel, Sand, Bricks), and stage-wise cash flow milestones.

Project Parameters

Customize built-up area, quality package, and elevation floors to calculate costs.

1,200 sq.ft
Total Slab Construction Area: 1,200 sq.ft

Basic / Budget Package

Economical residential finish with standard red bricks & standard tiles

1,550/ sq.ft

Standard / Premium Package

Most popular choice with branded fittings, granite stairs & false ceiling

1,950/ sq.ft

Luxury / Ultra-Premium Package

Italian marble, smart home automation, high-end woodwork & designer elevations

2,750/ sq.ft
Estimated Budget

Total Project Estimate

1950 / sq.ft
Estimated Turnkey Construction Cost
₹23,40,000

For 1,200 sq.ft built-up area with Standard / Premium Package

Materials (Cement, Steel, Sand, Bricks)₹8,21,520
Turnkey Labor & Shuttering (~30%)₹7,02,000
Finishes, Plumbing, Tiles & Electricals₹8,16,480

Need Blueprints & Structural Supervision?

Connect with empanelled Civil Engineers & Map Makers

Bill of Materials (BOM) & Quantity Estimator

CPWD-benchmarked material consumption norms for 1,200 sq.ft built-up area

Cement Bags Required
480 Bags (~50kg each)
Approx ₹1,82,400
TMT Reinforcement Steel
4.20 Metric Tons (MT)
Approx ₹2,60,400
Sand / M-Sand Quantity
2,160 Cubic Feet (Cu.Ft)
Approx ₹1,18,800
Coarse Aggregates (20mm)
1,560 Cubic Feet (Cu.Ft)
Approx ₹65,520
Bricks / AAC Blocks
21,600 Units / Pieces
Approx ₹1,94,400
Turnkey Labor & Supervision
~30% of Total Construction Cost
Approx ₹7,02,000

Stage-Wise Milestone Payment Schedule

Recommended cashflow release schedule to contractor based on certified construction milestones

1. Foundation & Sub-Structure15%

Excavation, PCC, footings, plinth beam & backfilling

₹3,51,000
2. RCC Slab & Structural Superstructure30%

Columns, formwork, brick masonry & roof RCC slabs

₹7,02,000
3. Plastering, Concealed Electrical & Plumbing20%

Internal/external plaster, pipe laying, wiring & conduits

₹4,68,000
4. Flooring, Woodwork & Tile Cladding20%

Tiles/marble laying, door frames, bathroom fixtures & waterproofing

₹4,68,000
5. Painting, Elevation, Fixtures & Handover15%

Primer, putty, emulsion, glass railings, switches & cleanup

₹3,51,000